Generation of early warnings in the identification of changes in deliverables in the execution stage of construction projects
Main Article Content
Abstract
In construction projects, changes continue to present themselves as a challenge that influences the normal development and success of the construction processes and stages of execution. Most of these changes are due to events and causes that in many cases could have been avoided. In this research, through a qualitative and documentary methodology, an extensive theoretical review of the causes of change and the impacts on cost and time was carried out, which, once analyzed and filtered, allow the most important causes and their impacts to be described and presented at a general level. Similarly, in the development of the research, the classification and level of importance of these types of changes and causes was validated through the implementation of a collection instrument, thus contrasting the findings of the review with the real context of the construction sector in Colombia. This information allowed the generation of a model for the generation of early warnings in order to prevent these changes in the execution stage of the construction process.
Downloads
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Published papers are the exclusive responsibility of their authors and do not necessary reflect the opinions of the editorial committee.
INGE CUC Journal respects the moral rights of its authors, whom must cede the editorial committee the patrimonial rights of the published material. In turn, the authors inform that the current work is unpublished and has not been previously published.
All articles are licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
https://orcid.org/0000-0002-1024-6077
